Answers marked with a * are required.
 
1. Please specify the importance of capital cost in guiding decision for the implementation of an ICT-based construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Capital cost
 
 
 
2. Please specify the importance of annual running cost in guiding decision for the implementation of an ICT-based construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Annual running cost
 
 
 
3. Please specify the importance of materials and equipment theft mitigation on sites in measuring the performance of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Theft Mitigation
 
 
 
4. Please specify the importance of materials availability on site in measuring the performance of the inventory management of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
materials availability
 
 
 
5. Please specify the importance of the recovery of misplaced materials on site in measuring the performance of the inventory management of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Misplacement recovery
 
 
 
6. Please specify the importance of delivery reliability in measuring the performance of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Delivery Reliability
 
 
 
7. Please specify the importance of data accuracy in measuring the performance of the inventory management of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Data accuracy
 
 
 
8. Please specify the importance of reliable lead-time in measuring the performance of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Reliable Lead-time
 
 
 
9. Please specify the importance of minimized operatives/equipment collision on sites in measuring the performance of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
Accident reduction
 
 
 
10. Please specify the importance of waste reduction in measuring the performance of a construction logistics system. *
  1 Not Important 2 May be important 3 Some Importance 4 Important 5 Very Important
waste reduction
 
 
 
11. In addition to the rating of the attributes named above, please rank their relative importance to each other in the following table with 1 representing the most important and 10 the least important: *
  1 2 3 4 5 6 7 8 9 10
Capital Cost
Annual Running Cost
Data Accuracy
Waste Reduction
Theft Mitigation
Material Availability
Reliable Lead-time
Operative/Equipment Collision
Delivery Reliability
Misplacement Recovery
 
 
 
 
 

Created with eSurveysPro.com Survey Software.